
PJM Interconnection’s 2026/2027 base residual auction fetched the FERC-mandated price cap in all zones, $329.17/MW-day.
 
 
Source link
  Add a comment
 
 
 
 
PJM Interconnection’s 2026/2027 base residual auction fetched the FERC-mandated price cap in all zones, $329.17/MW-day.
 
 
Source link

